Driveways


Driveways

From sunken or damaged driveway repairs to a new drive, we can help.

As with our patios and paving, we take great care in ensuring your new driveway is done properly using the best materials for both the finished surface and the parts you can’t see. 

Excavation is to a depth of at least 175mm, then your sub base of Type 1 MOT crushed Limestone is laid and compacted. We don’t use bricks and rubble for your sub base this is a corner cut which can lead to problems in the future.

 

Driveway Before

 

Driveway sub base

Once your sub base is ready, we then lay your block edging on concrete around the perimeter of your new driveway. A sharp sand screed is then compacted to lay your chosen blocks on.

Sharp Sand Bed

 

Driveway layout

 

Finished Drive

Take a look at a few of our other driveway projects below.